TO BE A LEADER OF MEN'S ACTIVEWEAR MANUFACTURING, CREATE MORE VALUE FOR SPORTS BRANDS.

Home / All / Quality Assurance / What performance tests should activewear pass before production?

What performance tests should activewear pass before production?

Update Time:2026/7/8

Performance fabrics must be verified, not assumed. A credible pre-production test plan covers:

  • Moisture-wicking – AATCC 195 (moisture management) for sweat transport;
  • Breathability – water-vapour transmission rate;
  • Opacity – the “squat test” to prevent sheer leggings;
  • Pilling – ISO 12945-2 (Martindale) after abrasion;
  • Colorfastness – ISO 105 / AATCC 61 (washing) and perspiration;
  • Dimensional stability – ISO 6330 laundry shrinkage.

Skipping these is the fastest route to “it looked fine in the showroom, failed on the body” returns.

subscription

TO BE A LEADER OF MEN'S ACTIVEWEAR MANUFACTURING, CREATE MORE VALUE FOR SPORTS BRANDS.